New Normal urgency $75k-$250k Overdue NPDES
Priority Score 52
Service Line Lift station rehab
Territory MT / Fallon
Owner Vincent Palafox
Due Date 2026-04-18
Next Action Validate the operator, engineer, and governing decision chain before outreach.
Peak Group Routing

Best internal fit for this opportunity

Open Ecosystem
High confidence Lead Peak Group Companies Support Advanced Pump & Equipment

Peak Group Companies is the best fit because Multiple internal companies show strong fit: Advanced Pump & Equipment, Advanced Lining, Peak Water Services.; A coordinated group response is likely stronger than a single-company start.

Multiple internal companies show strong fit: Advanced Pump & Equipment, Advanced Lining, Peak Water Services.
A coordinated group response is likely stronger than a single-company start.
Qualify this pursuit as a cross-company opportunity first. Start with Advanced Pump & Equipment as the leading operating team.
Opportunity Summary

Why this opportunity matters right now

Target Account CITY OF BAKER WWTF
Service Line Lift station rehab
Driver Compliance Pressure
Partner Path 129 statewide partner paths
Owner Vincent Palafox

BOD, 5-day, 20 deg. C (5); Flow rate (5); Solids, total suspended (4); pH (3); Nitrogen, ammonia total [as N] (3)

Next step: Validate the operator, engineer, and governing decision chain before outreach.

NPDES score: 360 Repeated NPDES issues (32 in last 2 years); evaluate lift stations, controls, pumping reliability, and reporting workflow.

Opportunity Readout

What is known and what still blocks movement

58 Strong

Strongest because of service fit, geography fit. Biggest lift available: relationship access, strategic importance.

Strength Service Fit 20/20
Strength Geography Fit 15/15
Strength Timing / Urgency 10/10
Gap Relationship Access 0/15
Gap Strategic Importance 2/10
Gap Partner Support 3/10
Use this brief to confirm ownership, next action, and contact path. Missing fields here should be treated as real gaps, not implied completion.
Opportunity Signals

Evidence behind the opportunity

2025-03-31 | Npdes Violations
BOD, 5-day, 20 deg. C (5); Flow rate (5); Solids, total suspended (4); pH (3); Nitrogen, ammonia total [as N] (3)
Validate the operator, engineer, and governing decision chain before outreach.
2025-03-31 | Dmr Pattern
max 60; avg 57.8
Review reporting workflow, SCADA telemetry, and operator coverage.
2026-03-28 | Site Notes
303(D) Listed
Validate whether this signal opens a service, rehab, or emergency-response angle.
Connected Intelligence

Lineage, territory, and network

Territory Context
CITY OF BAKER WWTF Org
Organization
Municipality | npdes
Baker, MT Territory
Region
State | MT
CITY OF BAKER WWTF Authority
Jurisdiction
Municipality | MT
Source Lineage
NPDES Source
Source Lineage
Npdes | MTG580029
Network Links
No linked network paths are mapped yet.
Relationship Graph

County ecosystem around this opportunity

Fallon, MT Density 75 Opportunity 60 Gap 38 High-density mature ecosystem

10 owners, 4 contractors, 0 engineers, 0 sources, and 37 opportunities tied to this territory.

Owners
Bison Pipeline Llc Fallon County 76
Governs
Owner service area or governed jurisdiction.
City of Baker 76
Governs
Owner service area or governed jurisdiction.
City of Baker Sandstone Creek 308 Permit 76
Governs
Owner service area or governed jurisdiction.
City of Baker Wwtf 76
Governs
Owner service area or governed jurisdiction.
Sources
No monitored source nodes are surfaced in this county yet.
Contractors
CT EXCAVATION INC 72
Based In
Headquarters or home territory.
CT EXCAVATION INC 72
Based In
Headquarters or home territory.
Griffith Excavating Inc. 72
Based In
Headquarters or home territory.
Griffith Excavating Inc. 72
Based In
Headquarters or home territory.
Engineers + Related Bids
No engineer or bid nodes are tied to this county graph yet.
Suggested Links

Who should be connected next

Contacts
No additional contacts are being suggested right now.
Partners
No additional partners are being suggested right now.
Action Cockpit

Keep the opportunity moving

Field Brief

Open the facilities context

Use the facility brief to ground this opportunity in the underlying site, system, and operational story before it moves deeper into active follow-up.

Export Path

Send the qualified record forward

Use the export preview when the opportunity story is clear enough to move into structured execution outside the intelligence workspace.

Regional Context

How this opportunity fits the territory

Readiness

New

Validate the operator, engineer, and governing decision chain before outreach.

Owner Vincent Palafox | due 2026-04-18

Target Contacts

Decision and access path

No target contacts are linked to this opportunity yet.
Partner Network

Warm routes and delivery support

No partner paths are linked to this opportunity yet.
Automation Events

Open system prompts on this opportunity

No open automation prompts are attached to this opportunity right now.