|
|
BRIGHAM CITY CONNECTION PROJECT
Construction General Permit
ID UTG071893
|
Private Utility |
Wastewater
Peak Group Companies
|
Brigham City |
- |
UT |
Private Utility
Missing operator
|
Missing contact
|
EPA NPDES Profile
NPDES
|
66
High Priority
Good Target
3 signals | 1 linked opportunities
Closest base: Blackfoot, ID | 117 mi
Inside the active state. Closest base Blackfoot, ID (117 mi)
High-severity issue
|
Incomplete
Opportunity Linked
Validate the operator, engineer, and governing decision chain before outreach.
|
Source only
Medium-confidence source
Unknown
Last verified -
Missing contact
Missing phone
|
Owner/operator or contact path is still missing, so this target is not ready for active qualification.
Validate the operator, engineer, and governing decision chain before outreach.
Moderate confidence
Cold
High-severity issue
|
|
|
|
BRIGHAM CITY CONNECTION PROJECT
Wastewater Facility
ID UTRC10715
|
Private Utility |
Wastewater
Peak Water Services
|
Brigham City |
- |
UT |
Private Utility
Missing operator
|
Missing contact
|
EPA NPDES Profile
NPDES
|
31
Background
Good Target
0 signals | 0 linked opportunities
Closest base: Blackfoot, ID | 132 mi
Inside the active state. Closest base Blackfoot, ID (132 mi)
No open issue
|
Incomplete
Incomplete
Keep in nurture queue and watch for new operational signals.
|
Source only
Low-confidence source
Unknown
Last verified -
Missing contact
Missing phone
|
Owner/operator or contact path is still missing, so this target is not ready for active qualification.
Keep in nurture queue and watch for new operational signals.
Weak signal
Cold
No open issue
|
|